Listed below are proposed General Application Special Provisions for the 2022 Alabama Standard Specifications for Highway Construction. These Special Provisions are posted on the ALDOT Specifications Webpage at https://www.dot.state.al.us/publications/Construction/Specifications.html To view them, go to 2022 รจ Proposed General Application Special Provisions.
GASP Number | Section | Subject |
22-GA0008 | 106, 401, 410, 423, 424, 804 | Asphalt Pavement |
22-GA0012 | 729, 893 | Intelligent Transportation Systems |
22-GA0020 | 260 | Cement Mortar Flowable Backfill |
22-GA0021 | 302 | Full Depth Reclamation with Portland Cement |
22-GA0022 | 452 | Slabjacking of Portland Cement Concrete Pavement |
22-GA0023 | 453 | Pressure Grouting and Repair of Portland Cement Concrete Pavement |
22-GA0024 | 513 | Prestressed Concrete Bridge Members |
22-GA0025 | 570 | Soil Nail Retaining Wall |
22-GA0026 | 571 | Shotcrete |
22-GA0027 | 815 | Cement |
Please use the Comment Form to post any comments that you may have on these proposed GASPs. The review period ends on December 30, 2022.
Thank You,
John R. Lucas, PE
Specifications Engineer
ALDOT – Construction Bureau
Office: (334) 242-6094