Project No. RAED-068-000-154 – Design Build US-43 From the Intersection of SR-5 in Thomasville to the Linden Bypass and on SR-69 From Linden Bypass to North of Moundville to Include Bypasses at Dixons Mills, Greensboro, Gallion, and Moundville. The purpose of the proposed project is to improve transportation connectivity from Thomasville, AL to I-20/59 by widening an existing two-lane facility to a four-lane facility from Thomasville, AL to Moundville, AL. The study area is through the heart of the Black Belt of Alabama and will provide four-lane access to many areas of the state that do not currently have a four-lane roadway Public Involvement: Fall 2021 Begin Right-of-Way Acquisition: Fall 2021 Begin Construction: Spring 2022 Click HERE for the link to the Request for Qualifications and Proposals |